01
Logical Connectivity
pin intent, network ownership, and source-to-destination relationships
02
Connector Definition
datum setup, entry points, mating orientation, and reusable library discipline
03
Spool Governance
wire classes, colors, shield or drain handling, twisted pairs, and coax definitions
04
Routed Harness Model
bundle paths, branch ownership, packaging fit, and physical installation realism
05
Flattening And Review
drawing readiness, branch legibility, connector callouts, and manufacturing interpretation
06
Release Package
revision-controlled handoff, controlled reuse, and service-readable documentation
Workflow path: Logical Connectivity → Connector Definition → Spool Governance → Routed Harness Model → Flattening And Review → Release Package
Installation motion, mechanical access, service removal, and manufacturing handling need to remain visible throughout the workflow instead of being checked only after the route is already committed.
↓
Installation / Service Context
clearances, branch handling, protective coverings, and downstream maintenance expectations